Belle Coachworks
Written By P J Spillings
Sector: Commercial / Industrial
Project: Fire damage reconstruction
Contract Type: Design and build
Location: Lowestoft, Suffolk
Value: £350,000
Team: P.J. Spillings, Philip Pank & Partners, Canham Consulting
Timescale: 14 Weeks
P.J. Spillings were contracted to reconstruct the Belle coachworks warehouse after fire damage inside the old building.
Our team completed this project in 14 weeks, this ensured that the Belle coachwork team were able to return to their newly renovated building to continue their work on vehicle maintenance as soon as possible.
Works included:
• Doors
• Windows
• Fire Protection
• Mechanical
• Drainage
• Electrical
• Steelwork
• Cladding
• Decorations
• Flooring
• Ceilings